Tsawwassen Landing

Master-Planned Community in Delta, BC

Project Overview

PROJECT TYPE: Townhomes / Wood frame and Concrete.

BUILDER: Onni

LOCATION: Metro Vancouver

SIZE: 156 units

COMPLETION DATE: 2022-06-23

SCOPE OF WORK: Forming and framing of 156 units, including supply of form panels, and hardware, for this scope of work.

Tsawwassen Landing is a master-planned community by Onni Group, located at 4738 Hemlock Way in Delta, BC. This expansive 120-acre development offers a curated collection of Craftsman-style single-family homes and townhomes, ranging from approximately 1,300 to 3,200 square feet. Designed to embody the West Coast lifestyle, the community features open-concept layouts, gourmet kitchens, and spa-inspired bathrooms. Residents enjoy access to over 30,000 square feet of indoor and outdoor amenities, including a fitness centre, yoga room, swimming pool, hot tub, sauna, steam room, squash courts, golf simulator, and children's play areas. Situated adjacent to Tsawwassen Mills Shopping Centre and near scenic trails and beaches, Tsawwassen Landing offers both convenience and natural beauty.

NuFrame was engaged to deliver a comprehensive material supply package for Tsawwassen Landing, encompassing wall panels, design, delivery, and labour for the wood frame structures. By overseeing every aspect from prefabrication to on-site installation, NuFrame ensured precision and efficiency throughout the construction process. Their integrated approach contributed to the successful realization of this distinctive development, enhancing Delta's residential landscape with quality craftsmanship and innovative design.

Condo Units Per Year

1,500

Condo Units Per Year

Townhome units per year

325

Townhome units per year

Forming units per year

250

Forming units per year

SQFT produced per year

1,450,000

SQFT produced per year